Tecnología de construcción y control de calidad de Subgrado Ferrocarriles

Jul 02, 2025 Dejar un mensaje

Tecnología de construcción y control de calidad de Subgrado Ferrocarriles

 

  • ¿Cuál es el principal proceso de construcción del subgrado ferroviario?

First, carry out construction preparations, including surveying and setting out, site clearing, etc. Then, conduct subgrade bed treatment. According to different geological conditions, methods such as replacement filling, compaction, and reinforcement are adopted to ensure that the subgrade bed has sufficient bearing capacity. Next, fill the subgrade filler in layers, controlling the thickness of each Capa, generalmente no excede los 30 cm . Utilice maquinaria de compactación a gran escala para rodar para garantizar que el título de compactación cumpla con los requisitos de diseño . después de llenar, construir la protección de la pendiente y las instalaciones de drenaje, como la configuración de las paredes de retención, la protección de la pendiente y las tuberías de drenaje de la colocación de las tuberías de drenaje .} Subgrade .

 

railway system

 

  • ¿Qué factores afectan la calidad de compactación del subgrado ferroviario?

Los factores principales incluyen las propiedades del relleno de subgrado, como el tamaño de la partícula, el contenido de agua y el índice de plasticidad . rellenos con buena gradación y contenido de agua cercano al contenido óptimo de agua de agua tienen mejores compactación de compactación . El tipo y el rendimiento de la maquinaria de compactación, los rollos de la carretera pesados ​​tienen mejores efectos de compactación que los rollos de carreteras de la luz . Los pases, la velocidad de rodadura y el grosor de compactación, deben ajustarse razonablemente de acuerdo con la situación real . entorno de construcción, como la temperatura y la humedad . En un entorno de alta temperatura y seca, el agua en el relleno evapora rápidamente, que no es compleja {}}} mientras la construcción en días lluvios Calidad .

 

railway

 

  • ¿Cómo llevar a cabo la observación y evaluación del asentamiento del subgrado ferroviario?

Establezca puntos de observación de liquidación en partes clave del subgrado, como el centro del terraplén y el hombro . use instrumentos, como los indicadores de nivel y las estaciones totales para observar regularmente los datos de liquidación ., la frecuencia de observación se encripta en la construcción temprana de la construcción y gradualmente disminuye a medida que los subgrades se estabilizan.}}}}}}}}} el análisis de la construcción temprano, se reducen gradualmente a medida que el subgrade se detiene.}}}}}}}}}}} el análisis de la construcción temprano, se reduce gradualmente a medida que el subgrade se detiene. - time curve, and use mathematical models such as the hyperbola method and the three - point method for settlement prediction. When the settlement rate meets the design requirements and the cumulative settlement is within the allowable range, the subgrade settlement can be considered to tend to be stable and pass the evaluation. If the settlement is abnormal, it is necessary to analyze the reasons in time and take treatment Medidas como refuerzo .

 

railway1

 

  • ¿Cuáles son los requisitos especiales para la construcción de subgrado en condiciones geológicas especiales (como la base del suelo blando)?

For soft soil foundations, the drainage consolidation method is often used, such as setting up sand wells and plastic drainage boards to accelerate the drainage of water in the soft soil and improve the foundation strength. The deep mixing method is used to forcibly mix cement, lime and other curing agents with the soft soil to form piles or walls with integrity, water stability and certain strength. Pile foundation forms such as Las pilas de CFG y las pilas de tuberías también se pueden usar para transferir la carga a la capa de suelo estable profunda . Durante el proceso de construcción, la velocidad de carga debe controlarse estrictamente para evitar la inestabilidad de la base, y el asentamiento y la observación de desplazamiento lateral deben fortalecerse para ajustar los parámetros de construcción a tiempo .

 

  • ¿Cuáles son los tipos y funciones de los proyectos de protección de subgrado ferroviario?

La protección de la pendiente incluye la protección de la planta, como la siembra de hierba, tumbado y plantación de árboles . Las raíces de la vegetación se usan para fijar el suelo y evitar el explosión de la pendiente . protección de la ingeniería, como el enlace, la protección de la pendiente de la pendiente de la buque de bala, se utiliza con la resistencia de la pendiente de la masonería, se utiliza la resistencia y la resistencia de la sola resistencia, mejoran la resistencia de la sola resistencia, aumentan la resistencia y la resistencia a la masonería, se utilizan la resistencia de la paja de la masonería, se utiliza la resistencia y la resistencia de la masonería. scouring resistance. Retaining protection includes retaining walls and anti - slide piles, mainly used to stabilize the subgrade slope, resist the soil sliding force, and prevent slope collapse. Scour protection changes the flow direction of water by setting up diversion structures such as spur dikes and longitudinal dikes, reducing the scouring of water on the subgrade, or using direct protection Medidas como gabiones y riprap para proteger el dedo del dedo del dedo del dedo de la pendiente del daño de la fregado .